Skip to main content

Track record

Selected projects

A cross-section of our mining and construction work. Filter by project type and application to find experience relevant to your scope.

Projects shown
7
Sectors
2
Applications
4

All projects

Filter projects

Type

Application

Showing 7 of 7 projects

  • Excavator and roller working on the rock-armoured TSF rock ring beside the tailings pond at Asanko GoldMining

    Mining project, Tailings Storage Facility

    Asanko Gold Raise 7 TSF Rock Ring Construction

    Rock ring construction on the tailings storage facility as part of the Asanko Gold Raise 7 project.

    Client
    Asanko Gold
    Location
    Asanko Gold Mine, Ghana
  • Drone view of a rock ring and red laterite causeway built into the Asanko Gold tailings storage facilityMining

    Mining project, Tailings Storage Facility

    Asanko Gold TSF Rock Ring (Aerial View)

    Drone view of the rock ring and access causeway built out into the Asanko Gold tailings storage facility.

    Client
    Asanko Gold
    Location
    Asanko Gold TSF, Ghana
  • Excavator trimming the Zone A embankment of the Asanko Gold Raise 7 TSF, with two KPS staff supervisingMining

    Mining project, Tailings Storage Facility

    Asanko Gold Raise 7 TSF Zone A Trimming

    Trimming of the Zone A embankment on the Raise 7 tailings storage facility.

    Client
    Asanko Gold
    Location
    Asanko Gold Mine, Ghana
  • CAT 16M motor grader and roller maintaining the Asante Chirano haul roadMining

    Mining project, Haul Road Maintenance

    Road Maintenance – Asante Chirano Haul Road

    Grading and compaction to keep the Chirano haul road safe and trafficable for the mining fleet.

    Client
    Asante Gold
    Location
    Chirano Site, Ghana
  • KPS staff carrying out early-morning prestart inspections on a line of haul trucksMining

    Mining project, Fleet Readiness

    Fleet Prestart Inspection & Readiness

    Early-morning prestart inspections so every haul truck is safe and ready before the shift begins.

    Client
    Asante Gold
    Location
    Chirano Site, Ghana
  • Padfoot roller compacting embankment fill while a surveyor checks levelsConstruction

    Construction project, Earthworks & Lining

    Construction of Embankment

    Layered fill placement and padfoot compaction to build an engineered embankment, with survey control.

    Location
    Ghana
  • Roll of black HDPE geomembrane being laid over a prepared earth platformConstruction

    Construction project, Earthworks & Lining

    Laying of Geomembrane

    Installation of HDPE geomembrane lining over a prepared and compacted subgrade.

    Location
    Ghana

Work with KPS

Have a similar project?

Tell us about your site and scope, and we will share relevant experience and a proposal.